Some pictures detailing the build of an Ibex - Chris Irons Mark IV 240 HT - 7F061
This is how it all begins - a pile of steelwork and a power saw.
Construction of the spaceframe at the Foers Engineering factory.
Completed spaceframe lifted free of the jig.
Completed spaceframes being sent out for galvanising. 'Jaffabex' is at the back.
On return from galvanising, the door frames are fitted, and the aluminium outer panels bonded in place.
The aluminium roof and bonnet are fitted, and the fibreglass wheelarch mouldings.
John Foers ("Mr Ibex"!) prepares to load Chris' completed Ibex shell for delivery.
Chris takes his new toy away to finish the build.
Quite a lot of very orange paint!
Standard LR wiring loom simplifies the electrics.
A justifiably proud Chris with his newly registered Ibex - christened 'Jaffabex'
On display at Billing LR show, in 2004
Scoring 950 on the RTI Ramp - Gaydon 1/5/2005